The team met with the Power Wayside team to discuss the power charger that last year's team received last minute. It was concluded that the power charger would be the responsibility of the Wayside team since it had more applications with them. The platform for carrying the arm and the power modules was also discussed, but no definite specifications have been made, other than the length of the third rail, which has been said to be 20ft but is subject to change.
Wednesday, October 2, 2019
2 October 2019
This past week, the team continued researching for supercapacitors, and how they can be combined with batteries. Further discussion of system specifications was considered, such as how much current the system will need to reach 48V to power the bogie to accelerate the bogie and get it to cruising speed, and the optimal resistance value for the system. Also, the integration of PCBs and their design was discussed. More research will be conducted in the coming week.
Subscribe to:
Post Comments (Atom)
15 April 2020
The team is discussing ethics. The group will begin working on the final report and the presentation.
-
The team is discussing ethics. The group will begin working on the final report and the presentation.
-
This week placed much emphasis on assigning roles and researching on the different components that will make up our power modulus. Sin...
-
Today we spent the majority of today looking for all the parts we need to build our power module. We were able to find a box for the housing...
No comments:
Post a Comment